Prepare structural plans, calculations, design criteria, and supporting documents for an efficient licensed engineer review.
Published 2026-09-17 · Updated 2026-09-17 · 9 minute read
Key takeaways
- Structural drawings should communicate a complete load path.
- Calculations must align with the geometry, materials, and details shown on the plans.
- Site conditions and existing construction cannot be assumed without adequate information.
Core information for structural review
A structural submission should identify the project location, adopted criteria used by the designer, materials, loads, member sizes, connections, foundations, and construction details relevant to the scope. Existing-condition work may also require field measurements, photographs, record drawings, or testing.
- Design criteria and referenced standards
- Gravity, lateral, environmental, and equipment loads as applicable
- Framing plans, sections, details, and connection information
- Foundation assumptions and geotechnical information when required
- Calculations coordinated with drawing marks and revisions
Coordination checks before submission
Compare calculations with every affected sheet. Verify member labels, dimensions, reactions, support conditions, material strengths, and detail references. Resolve conflicts between architectural, structural, mechanical, and equipment documents before requesting final review.
Common causes of review delay
Frequent delays include missing connection design, unclear existing conditions, unverified loads, outdated calculation packages, incomplete foundation information, and revised plans submitted without a revision narrative.
Frequently asked questions
Are architectural drawings enough for structural stamping?
Usually not when structural design is required. The engineer needs the structural information and calculations necessary to evaluate the applicable scope.
Do shop drawings replace structural design drawings?
No. Shop drawings typically communicate fabrication or installation details and must be coordinated with the governing design documents and delegated-design requirements.
Authoritative references
This guide provides general information, not legal or project-specific engineering advice. Confirm current requirements with the applicable licensing board and authority having jurisdiction.